Thursday, July 30, 2009

Opus Romano pattern

This pattern was laid with a tumbled edge travertine.
This project took a little more than a week to finish.

These stairs added a little bit of a challenge to the layout. I did not want to end up with a small piece right at the stairs, and as you see it worked great.


The design for these stairs was created by me. The homeowner loved them.



The homeowner wanted a transition from one tile to another, so it was my idea to use the same color granite as the counter tops.




Simple bathroom floor remodel

This was a simple tile job for a master bathroom. This job took 2 days to complete.
This layout was a little tricky because of the three doorways, the cabinets and the angled tub.

This shows how you can do something affordable and it can make a huge change.